Nepras Technologies NEPRAS
About Case Studies Blogs Contact Get a Quote →
Case Studies

Work that speaks for itself

We don't lead with promises. Here are the actual projects, the specific challenges, and the numbers we delivered — across industries, budgets, and timelines.

62 Projects delivered across 11 industries
94% Client retention rate over 3 years
3.2× Average ROI reported within 12 months
48h Average time from brief to first prototype
All Projects
Showing 1–6 of 10 projects
Shopify Development
CURRENCY $ · £ · € 99.8% uptime Live in 3 weeks · Launch ready
Sustainable Apparel Brand · eCommerce · United States

International Shopify store launched in 3 weeks with 32% higher conversion

A US apparel brand needed a fully international, SEO-optimised Shopify store — multi-currency and mobile-first — live before a press feature deadline six weeks out.

3 wksKickoff to launch
+32%Conversion lift
99.8%Uptime, first 3 months
Performance
92 PageSpeed (was 29) 6.8s load (before) 1.4s load (after) Revenue +23% in 60 days
Home Goods eCommerce Store · Australia

WooCommerce mobile PageSpeed taken from 29 to 92 in 60 days

An Australian ecommerce store was losing mobile shoppers to a 6.8-second load time. We rebuilt the performance stack without touching the storefront design.

92Mobile PageSpeed, was 29
1.4sLoad time, was 6.8s
+23%Revenue in 60 days
ERP Development
SKU STOCK STATUS AX-2201 1,240 In stock AX-2214 86 Low 98% Paperwork ↓80% · Order time ↓65%
Automotive Parts Manufacturer · Pune, India

Custom ERP replaced paper and WhatsApp for a Pune manufacturer

A 67-employee auto parts manufacturer ran purchase orders on paper and WhatsApp. A custom ERP brought inventory, orders, and reconciliation onto one system.

80%Paperwork reduction
98%Inventory accuracy
65%Faster order processing
Google Ads
IMPRESSIONS CONVERSIONS CPL $38 CPL $11
Project Management SaaS · United States

Same ad budget, 4× more leads — cost per lead cut from $38 to $11

A US SaaS company was generating leads but the sales team flagged poor quality. We rebuilt campaign structure and targeting on the same $2,500/month spend.

5.8×Return on ad spend
$11Cost per lead, was $38
183Conversions/month, was 46
CRM Development
NEW LEADS IN PROGRESS RENEWED Zero duplicate records · Auto renewal reminders
Insurance Brokerage · United Kingdom

Custom Laravel CRM cut manual work 70% for a UK insurance brokerage

A 22-person brokerage ran its entire operation across seven Excel files, losing 14 hours a week to manual entry and risking duplicate client outreach.

70%Manual work reduction
Faster lead processing
0Duplicate records
Local SEO
1 Top 3 · Maps Calls +400% Bookings +190%
Physiotherapy Clinic Group · Greater Toronto Area, Canada

Four clinics went from invisible on Google Maps to Top 3 in 4 months

A physiotherapy group with four Toronto-area locations had 11 years of inconsistent directory listings actively suppressing their local rankings.

400%More inbound calls
Top 3Google Maps ranking
+190%Appointment requests
Mobile App
Live Class · 6:00 PM Assignment due 9pm 25K+ downloads 4.8★ rating 92% retention
Test Prep EdTech Startup · Hyderabad, India

EdTech app built in 15 weeks — 25,000+ downloads, 4.8★ rating

A Hyderabad test-prep company needed live classes, assignments, and payments in an app before its first digital batch started, with a 4-month hard deadline.

25K+App downloads
4.8★Play Store rating
92%30-day retention
SEO
150/mo 3,850/mo 165 keywords · Top 10
Industrial Components Manufacturer · Gurgaon, India

Organic traffic grew 25× for a Gurgaon industrial manufacturer

An 18-year-old manufacturer relied entirely on referrals, with just 150 monthly organic visitors. Six months of technical and content SEO changed that.

25×Organic traffic growth
165Keywords in top 10
94Leads per month
SEO Recovery
Migration 100% recovered 7yrs of rankings
Home Furnishings Retailer · United Kingdom

70% of organic traffic lost in a migration — fully recovered in 90 days

A UK retailer's botched platform migration wiped seven years of organic visibility overnight. We rebuilt the technical foundation and rescued the rankings.

100%Traffic recovered
90 daysRecovery timeline
+160%Revenue vs pre-migration
Web Redesign
BEFORE 72% bounce AFTER GET A QUOTE 39% bounce
Facilities Management Company · United Kingdom

Bounce rate cut from 72% to 39%, leads up 210% in 8 weeks

A UK facilities management company hadn't updated its site since 2016 and was losing tenders on ‘professionalism’ concerns before a call even happened.

39%Bounce rate, was 72%
+210%Lead increase
3m 46sSession duration, was 1m 02s
How every project gets delivered

Every case study above followed the same four-phase process. No surprises, no scope creep, no ghost-deliveries.

01

Discovery & Scoping

We spend the first week understanding your business context — not just the feature list. What does success look like in 12 months? What's broken right now? What constraints are non-negotiable? This shapes everything that follows.

02

Architecture & Prototype

Within 48 hours of sign-off we have a working clickable prototype. The architecture document is written before a single line of production code. You see the system before we build it.

03

Iterative Build with Weekly Demos

We build in 2-week sprints and demo to you every Friday. You see real working software — not status updates. Feedback is actioned before the next sprint begins.

04

Launch, Handover & Support

Go-live is a staged rollout, never a big bang. You receive full documentation, codebase ownership, and 90 days of post-launch support included in every engagement.

Client Voices
What they say after we deliver
★★★★★
We interviewed eight agencies. Nepras were the only ones who pushed back on our brief — they told us we were solving the wrong problem. They were right. What we built together was completely different to what we asked for, and it's performing beyond any projection we had.
KS
Karan Sharma
CEO, FinPocket
★★★★★
The Nepras team understood FCRA compliance requirements from day one — we didn't have to explain the regulatory context. The fund segregation and utilisation tracking is exactly what our auditors need. It's saved us enormous anxiety at every year-end.
PM
Padmini Menon
CFO, Saksham Rural Trust
★★★★★
Our previous platform crashed when we hit 500 concurrent users. Nepras rebuilt the backend in 6 weeks and we've since crossed 8,000 concurrent without a single incident. I wish I'd found them a year earlier — it would have saved us three difficult months.
AT
Arjun Tiwari
CTO, WorkBridge
Industries Served
We've shipped across 11 sectors
Non-Profit / NGO
14 projects
Fintech
11 projects
eCommerce
9 projects
SaaS
8 projects
Healthcare
6 projects
Logistics
5 projects
EdTech
4 projects
Government / PSU
3 projects

Ready to become
our next case study?

Start a Conversation Request a Project Quote
Response within 1 business day · NDA available on request